Wimbledon Basement Build
See our project below, we have completed for our satisfied client. If you want to know the cost of a similar project, please contact us to Get a quote or call us on 0203 409 4215 to speak with our planning consultants.
Wimbledon Park, London
210 sqm
December 2014
- Basement Extension
- New Build
26 Lincoln Avenue
26 Lincoln Avenue showcases the complete transformation of a Wimbledon Park plot, replacing an outdated detached house with a contemporary three-storey residence featuring a full basement. Designed to maximise space and modern living potential, the new home spans approximately 610 m² of construction area. This project stands as a notable redevelopment, redefining the site with a fresh architectural vision and a significantly enhanced residential footprint.
The Problem Statement
The challenge was to move beyond limited extension options and create a full replacement dwelling that maximised site potential, enhanced internal space, and delivered modern, efficient living within the existing plot constraints.
- Basement Extension
- New Build
- Planning
- Building Regulation
- Construction
Wimbledon Park,
London
London Borough
Of Merton
210 sqm
610 sqm
Full Build
December 2014
The Client Brief
The client approached us with a clear ambition to unlock the full potential of their plot. After exploring several extension possibilities with other consultants and none of which offered the scale or quality of transformation they envisioned. They turned to our team for a more forward-thinking approach. What began as an enquiry about a possible two-storey extension quickly evolved into a far more ambitious brief: the complete design and delivery of a new replacement dwelling.
The client wanted a home that would not only provide generous internal accommodation but also embrace modern living standards, improved spatial efficiency and a more refined architectural expression. Our task was to rethink the site from the ground up, ensuring every square metre was utilised effectively while elevating the overall functionality and character of the home. The resulting proposal reflects a balance of thoughtful planning, contemporary design and a commitment to maximising long-term value for the property.
Our Process
The Solution
We proposed a complete redevelopment of the site, starting with demolishing the existing structure to create space for a more efficient layout, a larger footprint and a significantly higher standard of accommodation. From the outset, our team took full ownership of the planning journey — addressing local objections, preparing all required documentation and successfully presenting the scheme at a planning committee review. Once approval was secured, we delivered comprehensive architectural designs that balanced the client’s ambitions with the character of the area, ensuring the project met both aesthetic and functional goals.
To maximise the potential of the plot, the new scheme was designed as a three-storey property with an additional basement level, creating generous living spaces while remaining sensitive to the surrounding context. Throughout the process, we coordinated closely with consultants, engineers and contractors, overseeing each stage right through to the start of construction. The result was a well-considered, future-ready design tailored to meet the client’s objectives.
Summary Of Works
The project involved demolishing an existing detached property to make way for a new semi-detached home spanning approximately 610 m² over three storeys and a full basement level. Our team began by conducting comprehensive feasibility studies to establish the project’s potential and constraints.
We then secured planning approval, managing neighbour objections and presenting the scheme to the planning committee to ensure a successful outcome. Following approval, we developed detailed design drawings and coordinated with consultants and contractors. We continued to oversee the scheme through the construction phase, ensuring the design intent and project quality were fully maintained.
0 Months
Design Duration
0 Months
Build Timeline
+ 0 %
Value Boost
+ 0 %
Kitchen Usage
+ 0 %
Natural Light
+ 0 %
Layout Efficiency
Nikki